This project will replace dehumidification and temperature control system for the pool air and water in accordance with any new code upgrades affecting duct size, airflow, etc., replace exterior doors and closers to include electronic keyless entry system, repair air handling unit above ceiling in conference room, replace gym lighting with LED fixtures, replace gym floor, replace entire storefront and lobby redesign, and replace HVAC for facility.
Design phase
Total Project Cost: $1,709,605
Jimmy Millar, Project Manager