I need to obtain a Clearing and Grading permit. When can I begin installing my silt fence and tree protection for the inspection?

Clearing and Grading inspections are performed to ensure that all sediment and erosion controls (i.e. - silt fence, inlet protection, and construction entrances) and tree protection has been installed per your approved plans. You can only begin installation of these BMPs after you have received your Town approval and SCDHEC Construction General Permit (CGP). Clearing and Grading permit applications are availabe at the "Forms" page. Remember to have your SWPPP inspector inspect the site and sign the application prior to submitting to the Town. Submit all Clearing and Grading applications to ddandy@tompsc.com. The Clearing and Grading Inspector will contact you to coordinate an inspection date and time.

Show All Answers

1. Does my project need to receive some type of NPDES review for the Town?
2. I have a 2006 State Construction permit, what do I need to do to meet the 2012 requirements?
3. What are the requirements of Section 3.1.1.F?
4. Where do I find 2012 Construction Permit information and forms?
5. I need to obtain a Clearing and Grading permit. When can I begin installing my silt fence and tree protection for the inspection?
6. What is considered land disturbance?
7. Do I need to hire a certified SWPPP inspector to perform inspections at my project?
8. I installed/have a stormwater BMP on my property. Do I have to maintain the BMP or does the Town?